KPD.

Project Description

Installation date: April 2018

Kilowatts: 100kWs

Configuration: 384 x 260watt TrinaSmart Smart models, 4 x Fronius Eco 25kW Inverters

KPD and their environment policy saw them looking at ways to be more energy efficient, with one of their major options being the installations of a photovoltaic solar system. The directors Paul and David could see the benefits of using the Smart Solar technology with its very detailed monitoring and performance reports together with its additional generation and were also very conscious of the safety features of the system and its compliance with global best practice rapid shutdown requirements. Daily Validation reports and individual panel fault notifications ensure that the system is continually operating at its peak performance.

KPD are enjoying average annual kWH savings 172,493.00.