About the project

  • Client: St Joseph_s College, Gregory Terrace
  • Category:
This system is installed over several different sub boards and roof lines. The college could see the benefit of the Tigo SmartSolar both for its very detailed monitoring but more importantly for the safety of the pupils within the school. Knowing that the installation of a Tigo SmartSolar system was keeping up with World Best Practises could give the management of the college peace of mind. St Josephs College is now enjoying average annual kWH savings of 170,143.25.

ABout The Project

This system is installed over several different sub boards and roof lines. The college could see the benefit of the Tigo SmartSolar both for its very detailed monitoring but more importantly for the safety of the pupils within the school. Knowing that the installation of a Tigo SmartSolar system was keeping up with World Best Practises could give the management of the college peace of mind. St Josephs College is now enjoying average annual kWH savings of 170,143.25.

Project Description

Project: St Joseph’s College

Installation date: November 2017

System type NSW: Combination of 260w and 310w Tigo TrinaSmart modules, 2 x Fronius ECO 27, Fronius SYMO 20 and a Fronius SYMO 12.

System size: 99.18 KWS

Location: Gregory Terrace, Spring Hill Queensland

Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance to both systems.

St Josephs College, Gregory Terrace »

Gallery