About the project

  • Client: Komatsu Sydney
  • Category:
Showing the management at Komatsu the detailed monitoring available with the Tigo SmartSolar was a surprise to all parties. Mainly to the SCE team as the Komatsu management had an in depth understanding of the importance associated with detailed monitoring.

ABout The Project

Showing the management at Komatsu the detailed monitoring available with the Tigo SmartSolar was a surprise to all parties. Mainly to the SCE team as the Komatsu management had an in depth understanding of the importance associated with detailed monitoring. This was due to the fact that Komatsu have a similar in-depth monitoring system within all their excavation machinery, allowing them to ensure maximum performance while being advised early of any upcoming and unseen issues. Because of this they could instantly see the huge benefits of having a similar monitoring system within their solar system. The Tigo SmartSolar system married in perfectly with Komatsu’s monitoring philosophy and was a perfect fit for the company.

True to their philosophy the Komatsu team are all over the monitoring of the SmartSolar and are loving the detailed information available to them.

Komatsu are enjoying average annual kWH savings of 145,608.

Testimonial

What drew Komatsu to SCE Energy was the technology they were offering and in particular, the monitoring capabilities of the Tigo system. The panel monitoring capability of the Tigo system has proven to be very beneficial already with some minor issues in the setup being identified through this panel monitoring, which SCE Energy has been able to promptly resolve.

Project Description

Project: Komatsu Sydney

Installation date: November 2018

System type:  294 x 340watt TrinaSmart Smart modules, 4 x Fronius Eco 25kW Inverters

System size: 99.72kW

Location: Fairfield, NSW

Rebate assistance: $62,685

Annual Energy Production: 154,705kWh per year and 423.8per day

Annual CO2 saved: 126,860kgs per year and 347.6kg per day

Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance

Komatsu Sydney »

Gallery