ABout The Project
Angelo and John Notaras were very keen to work with SCE and our Tigo SmartSolar systems as the two men have been frontrunners with technology for all of their lives. Being inventors themselves with the first ever cordless drill, they were very excited to have the world leading solar technology being fitted to their Heritage and fully restored theatre in Grafton. Although there were a few shading issues that needed overcoming the main driver for the two men was the safety features associated with Tigo SmartSolar and the assurance their theatre would not burn down due to a solar related issue.
Saraton Theatre is now enjoying an average annual kWH savings of 53,655.00.
Testimonial
More importantly the technology continually monitors our solar systems performance and will advise us of a system fault in real time, ensuring our investment is performing as designed. The installation of the equipment was completed around our timetable and the SCE Installation Team completed the works seamlessly and without any disruption to the operation of the theatre. The ongoing communication with Jon, the Director of the company, has been a testament to SCE Energy Solutions great after sales service. The investment in the energy saving equipment has been a fantastic investment resulting in real savings to our electricity costs. We have no hesitation in recommending SCE Energy Solutions to any organisation looking to reduce their electricity costs
Project Description
Project: Saraton Theatre
Installation date: July 2014
System type NSW: 140 x 250watt TrinaSmart Smart modules, 2 x Fronius 15kw SYMO inverters
System size: 35kW
Location: Grafton, NSW
Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance to both systems.