ABout The Project
The system is installed at botany on a five-story office building. It was a complex install with all the modules, inverter and balance of the system needing to be craned to the rooftop for installation. Additionally, as the building was close to the airport we required special permits to allow the crane to operate.
Lakes Business Park is now enjoying an average annual kWH savings of 73,584.00.
Project Description
Project: Lakes Business Park
Installation date: July 2014
System type: 192 Tigo TrinaSmart modules, Fronius Centralised CL48 Inverter
System size: 48kWs
Location: Botany, NSW
Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance to both systems.