About the project

  • Client: Lakes Business Park
  • Category:
The system is installed at botany on a 5-storey office complex. It was a complex install with all the modules, inverter and balance of system needing to be craned to the rooftop for installation. This was a little more difficult than it sounds as being so close to the airport required special permits to allow the crane to operate. Lakes Business Park is enjoying average annual kWH savings of 73,584.00

ABout The Project

The system is installed at botany on a five-story office building. It was a complex install with all the modules, inverter and balance of the system needing to be craned to the rooftop for installation. Additionally, as the building was close to the airport we required special permits to allow the crane to operate.

Lakes Business Park is now enjoying an average annual kWH savings of 73,584.00. 

Project Description

Project: Lakes Business Park

Installation date: July 2014

System type: 192 Tigo TrinaSmart modules, Fronius Centralised CL48 Inverter

System size: 48kWs

Location: Botany, NSW

Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance to both systems.