ABout The Project
Working with owners Anthony Karam and Corriene Karam of TMA to assist with them tackling their increasing energy costs, it was an easy decision for Corrine to go solar when seeing the returns available by producing your own green energy. “This is a no brainer” with returns this good. Once the decision was made to go with solar it was then time to decide on what technology would provide that energy. On recommendation from other businesses and after seeing the many benefits incorporated within Tigo SmartSolar the decision was a simple one. Installing the only system that complied with Global Safety Regulations was the only smart business choice. TMA enjoy the benefits of safety ensuring their core business is protected, the ability of confirming their investment is performing at it optimum and the security of knowing the installed system is being monitored for that optimum performance by a third party.
TMA is enjoying a combined average annual kWH savings of 459,980 for both of their sites
Testimonial
Project Description
Project: TMA Group VIC
Installation date: October 2018
System type NSW: 303 x 330watt TrinaSmart Smart modules, 3 x Fronius Eco 27kW Inverters
System size: 99.99kw
Location: Truganina, Victoria
Rebate assistance: $57,440
Annual Energy Production: 172,699kWh per year and 473.1per day
Annual CO2 saved: 184,790kgs per year and 506.3kg per day
Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance