About the project

  • Client: Assta Label House
  • Category:
Astor metal finishes have 20 years’ experience in the metal finish business and are world leaders in Super Chrome truck rims. They strive for excellence in everything they do. Installing an 100kW smart Solar system at their Fairfield East business premises was in keeping with their business philosophy.

ABout The Project

Astor metal finishes have 20 years’ experience in the metal finish business and are world leaders in Super Chrome truck rims. They strive for excellence in everything they do. Installing an 100kW smart Solar system at their Fairfield East business premises was in keeping with their business philosophy.

Taking advantage of the zero-deposit finance, the $57,960 STC grant and the instant asset tax write off, this system had zero outlay while it paid for itself and had an incredibly fast return on investment – just three years.

Richard, the owner of the business was excited from week one after seeing the immediate savings live on the Fronius Solarweb site and was pleased to be doing his part, from an environmental aspect, by removing 124 tonnes of CO2 each year.

Three Fronius ECO 25 kW inverters and one Fronius SYMO 17.5 KW inverter were installed and coupled to 270 x 370Watt Trina Smart Modules. Tigo DC optimization insured the investment and the existing business was safe while providing continual returns with system performance monitoring.  

Testimonial

We are Saving money already. We looked at other systems but were impressed with SCE technology, and they are also great people to deal with. The NO deposit finance was very simple.
Astor Metal Finishes »
Richard Hammond
Owner of Astor Metal Finishes

Project Description

Project: Astor Metal Finishes

Installation date: December 2019

System type: 270 x 370watt TrinaSmart Smart Modules, 3 x Fronius ECO 25kW Inverters & 1 x Fronius SYMO 17.5kW Inverter

System size:  99.9kW

Location: Fairfield East

Rebate assistance: $57,960

Annual Production: 151,615kWh per year and 415.4per day

Annual CO2 saved: 124,324kgs per year and 341kg per day

Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance

Astor Metal Finishes »

Gallery