About the project

  • Client: Sweet Temptation Patisserie
  • Category:
From the time the system was installed it was cash-flow positive straight up! We went with the Tigo SmartSolar system due to its additional performance, safety features, and monitoring features. SCE has been great with the installation and ongoing service works when needed. It is great to know that SCE is keeping an eye on my system's performance and that it is always working to its peak.

ABout The Project

Sweet Temptations is enjoying average annual kWH savings of 18,396.00.

Testimonial

From the time the system was installed it was cash-flow positive straight up! We went with the Tigo SmartSolar system due to its additional performance, safety features, and monitoring features. SCE has been great with the installation and ongoing service works when needed. It is great to know that SCE is keeping an eye on the performance of my system and that it is always working to its peak.
Bradley Tomas
Managing Director Sweet Temptations Patisserie

Project Description

Project: Sweet Temptation Patisserie

Installation date: December 2014

System type: 48 Tigo TS4 TrinaSmart modules, Fronius 12kw SYMO Inverter

System size: 12kWs

Location: Lane Cove West, NSW

Safety: Tigo DC management system with full optimization and Rapid Shutdown compliance to both systems.

Sweet Temptation Patisserie »

Gallery